Connect Rentman
Keep working in Rentman. Link it once and the company’s stock fills itself in and stays up to date, and every stage plot can be opened from its Rentman project.
Link it once (about a minute)
- Who – the company’s owner or an editor in I.S Stage Plot, with a Rentman user that can see the equipment and projects
- Open – Company inventory → Rentman → Connect Rentman, and type your Rentman address (the part before .rentmanapp.com)
- Copy – Rentman opens. Go to Configuration → Integrations, and in the API section press Show token and copy it
- Come back – switch back to I.S Stage Plot and paste it. The stock is read right away
Before you make a key
Rentman keeps one key per Rentman user: making a new key switches the old one off. If you already use a Rentman key in another app, use that same key here, or make the key with a separate Rentman user.
Check a few items
The app matches your Rentman items to its own gear – “Shure SM58” to SM58, “XLR 10m” to your 30 ft cables – and skips lighting, truss and other departments. It only asks about the items it isn’t sure of, and you can change any match later (Company inventory → Rentman → Check how each Rentman item is matched). Matches you choose are remembered. After that the stock refreshes by itself whenever the inventory or the event check is opened.
The counts are what you own
Rentman’s public API shares how many of each item the company owns, not what is free on a date. The event check shows what the plot needs against your stock; whether it is free that day is checked in Rentman – which is what sending a request is for.
Send an event’s equipment to Rentman
- Send – Event equipment → Send to Rentman: Rentman gets a rental request with the event’s date, the venue and one line per item
- Matched items – everything you have in Rentman arrives already linked to your Rentman item. A cable length you don’t stock is sent as the next longer one you do
- The rest – gear that isn’t in your Rentman is listed in the request’s note, so nothing blocks turning the request into a project. Use Match… on a line to pick the Rentman item it is
- In Rentman – open Projects → Rental requests, pick the client and press Create project. Rentman then plans the gear and checks availability
- Afterwards – the plot links itself to the new project, and sending again before that updates the same request
Stage plots in Rentman projects
- Start from the project – New project → From a Rentman project: the plot opens with the project’s name and date, already linked
- Or link an existing plot – File → Attach to a Rentman project, or accept the suggestion when the plot’s date matches a project
- In Rentman – the project gets a task with a view-only link to the live plot, so the crew always opens the latest version. Nobody can edit the plot through that link, and you can switch it off in Share
- Gear check – Event equipment compares what the plot needs with the equipment planned on the Rentman project and shows what is short
What we read and write
We read your equipment, stock and current projects, and the equipment planned on linked projects. We write one task per linked plot, and a rental request when you press Send to Rentman – nothing else. If Rentman refuses the key, check that your Rentman plan includes API access. The key is stored encrypted and teammates never see it. Unlink any time from Company inventory → Rentman; that deletes the key at once.